Information
Certificate | Standard | Status | Address | Building Project | Type of Building | ERA |
---|---|---|---|---|---|---|
SO-182 | Minergie |
Final 8.8.2007 |
Langmattstrasse 12 5015 Erlinsbach SO |
New construction | Single-family house | 258m2 |
Technical Information
Heating
100% Heat pump outside air
Domestic Hot Water
10% Electric boiler
51% Solar energy thermal
39% Heat pump outside air
Stakeholders
SIB Sepp Imfeld Baumontage
Langmattacker 1
5015 Erlinsbach (SO)